The First Word Newsletter is designed to give you a look ahead to upcoming solicitations anticipated to be issued within the next ninety days, and also solicitations that are projected at a later date, pending budget approval and/or availability. Make sure your firm is registered under the proper commodities so that you will receive electronic notification. Upcoming projects include

                                                Economic Stimulus Projects

Collier County has prepared the following list of for consideration under the President’s Stimulus Package. The tentative date for the proposed legislative approval signing is February. We will update this as information becomes available. Please keep in mind that we cannot guarantee any of these projects will be approved.


• Gordon River Pass Dredging

            Transportation
• Reconstruction of Roads in the Estates
• County Barn Road, including LASIP
• Lee County to Collier County Transit Corridor
• FPL Greenway
• Oil Well Road (Immokalee Road to Camp Keais)
• SR 84 (Radio Road to SR 951) and SR 951 (SR 84 to Golden Gate Canal)
• Marco Island Bridge (S.S. Jolley Bridge)
• Collier Area Transit (CAT) Transfer Station at Collier County Government Center
• Shell Island Road (Rookery Bay National Estuarine Reserve)
• Valewood/Autumn Oak and Northbrook Drive

                    Stormwater
• Freedom Park (FKA Gordon River Water Quality Park)
• Gateway Triangle Stormwater Improvement Project
• Lely Area Stormwater Improvement Project (LASIP)


          Public Utilities (90- to 120-Day)
• Northeast Water Reclamation Facility – Construction
• Northeast Regional Water Treatment Plant – Construction
• Northeast Regional Water Treatment Plant – Wellfield
• North County Water Reclamation Facility – Bridge the Gap Project
• North County Water Reclamation Facility – Compliance Assurance Project
• Master Pump Station 308, 306, 312 Rehabilitation
• Lift Stations Upgrades and Rehabs
• Northeast Water Reclamation Facility & North East Regional Water Treatment Plant-Site Development
• Water Distribution Improvement - West Wind
• Collier County Landfill Road
• Re-Use Water Isolation Valve Replacement and Installation
• Master Pump Station 308, 306, 312 Spill Containment
• Sewer Line Rehab, Manholes, Wet Well, and Dry Well
• Install Cross-Connection Control Devices
• South County Water Reclamation Facility – Odor Control System for Aeration Basin
• North County Water Reclamation Facility – Rehab clarifiers 6, 7, 8, and 9
• Upgrade Leachate Line at the Collier County Landfill
• Collier County Infiltration and Inflow Implementation: South
• Neighborhood Enhancement Program: Kings Lake
• Collier County Landfill Front Entrance
• Traffic Vulnerability for selected stations
• Hitching Post Force Main Replacement
• Collections, Data Flow System Pump Control Unit to Telemetry Control Unit change-outs
• US 41 and Catalina, Force Main and Irrigation Quality Main Relocation
• Utilities Lightning and Surge Protection for all Plants
• North County Water Reclamation Facility - Rehab Clarifiers 2 and 3
• Chlorine Storage Improvements at South County Regional Water Treatment Plant
• Master Pump Station 302 Generator
• Water Main Interconnect with Bonita Springs Utilities
• Neighborhood Enhancement Program: Wyndemere
• Carlton Lakes Wellfield Access Road - Phase 2
• Roof Repairs at North County Regional Water Treatment Plant - Phase 2
• Silo Stairway at South County Regional Water Treatment Plant
• South County Water Reclamation Facility - Replace Sludge Press # 1
• South County Water Reclamation Facility - Replace Control Panels for all 10 Treatment Process Blowers
• Pelican Bay Re-Use Tank Cover
• Roof Repairs at North County Regional Water Treatment Plant - Phase 1
• South County Water Reclamation Facility - 2nd Story Expansion - Process Control Room
• North County Water Reclamation Facility-Treatment Process Blower
• North County Water Reclamation Facility- Pitch floors in two EQ Tanks
• North County Water Reclamation Facility - Extend press building
• Replace Variable Frequency Drives for Irrigation Quality Pump Stations #5 and #6
• South County Regional Water Treatment Plant - Piping from Raw Water Main to Sand Separator
• Master Pump Station 107 Grease Removal System
• South County Water Reclamation Facility- Re-paint Exterior of Operations Building
• Water Main Replacement – Trail Boulevard North
• South County Water Reclamation Facility - Electrical circuit Breaker Calibration
• South County Water Reclamation Facility- Variable Frequency Drives Upgrades
• North County Water Reclamation Facility - Electrical Circuit Breaker Calibration
• South County Water Reclamation Facility- Extend Arms of Seven Anoxic Mixer Hoists
• South County Water Reclamation Facility - Raise 12 Electrical/Instrumentation Manholes
• Goodland Disinfection Rehabilitation
• South County Water Reclamation Facility - Replace Surge Suppressors
• North County Water Reclamation Facility - I&E Tech Room Wall


                                 Public Utilities (180-Day)
• Immokalee Irrigation Quality Water Main from Northeast Water Reclamation Facility
• North County Regional Water Treatment Plant – High Total Dissolved Solids Reverse Osmosis - Degasification Towers
• Reclaimed Water Aquifer Storage and Recovery
• North County Water Reclamation Facility Odor Control and Aeration Basin Covers
• North County Regional Water Treatment Plant – High Total Dissolved Solids Reverse Osmosis - Odor Control
• Irrigation Quality Water System - Telemetry to 10 Sites
• Collections – Telemetry to 13 Lift Stations
• Willoughby – Delasol 8" Water Main Interconnect